A shift in the process mean for a measured characteristic would most likely be detected by a:
c-chartp-chart
x-bar chart
R-chart
s-chart
Show or Reveal the Answer
x-bar chart
A trend (in control charting) is typically described as:
Seven points in a row that are beyond the control limitsSeven points in a row either above or below the center line
Seven data points in a subgroup
Seven points in a row in either an upward or downward direction
Show or Reveal the Answer
Seven points in a row in either an upward or downward direction
When using a control chart, one should gather data:
From inspection recordsThat is easiest to collect
In the order of production
None of the above
Show or Reveal the Answer
In the order of production
The project charter is best described as
A code of conductA set of commandments
A credo adopted by the team at the beginning of a project
A collection of documents that provide purpose and motivation
Show or Reveal the Answer
A collection of documents that provide purpose and motivation
Quartiles are utilized by which of the following tools?
Run chartsHistograms
Fault tree diagrams
Box and whisker plots
Show or Reveal the Answer
Box and whisker plots
In the construction of a Pareto chart for the number of defects in a welding process, four categories of defects were recorded, as identified in the table below. The correct ranking for the Pareto chart categories from left to right would be
Porosity, Burn-thru, Undercut, and Short Weld
Undercut, Short Weld, Burn-thru, and Porosity
Porosity, Short Weld, Undercut, and Burn-thru
Burn-thru, Undercut, Short Weld, and Porosity
Show or Reveal the Answer
Porosity, Short Weld, Undercut, and Burn-thru
Who is responsible for creating and confirming the project charter?
Project ChampionMaster Black Belt
Quality Leader
Board of Directors
Show or Reveal the Answer
Project Champion
Process Decision Program Charts are used for all of the following EXCEPT:
Planning specific contingenciesDesigning a set of experiments to modify a process
Steering events in a required direction if unanticipated problems occur
Finding many counter measures to overcome problems
Show or Reveal the Answer
Designing a set of experiments to modify a process
In six sigma, a run chart can reveal:
Points out of controlShifts
Trends
B and C only
Show or Reveal the Answer
B and C only
Pre-control charting uses which of the following to determine process goodness?
Standard deviationRange values
Specifications
None of the above
Show or Reveal the Answer
Specifications
Which of the following would not be considered an input in the airline business?
Flight crewGround equipment
Reservation personnel
Energy in the form of fuel
All the above are inputs
Show or Reveal the Answer
All the above are inputs
Which of the following would be considered a service department for an airline?
A. Maintenance.B. Information Systems.
C. Purchasing.
D. Flight Catering.
E. All of the answers are correct
Show or Reveal the Answer
All of the answers are correct
Janine is a senior financial manager who has ensured that the hospital in which she leads the finance department has all the resources necessary to implement Six Sigma methodologies. Janine is considered a:
black beltchampion
master black belt
green belt
Show or Reveal the Answer
champion
Explanation : Janine is considered a champion.
Champions within an organization are individuals who are business leaders or senior managers and who are well versed in Six Sigma methodologies. Champions understand that Six Sigma requires sufficient financial, human, and operational resources to bring about successful outcomes. While they are typically involved in senior management, champions make sure that practitioners such as Black Belts have these resources.
Explanation : Janine is considered a champion.
Champions within an organization are individuals who are business leaders or senior managers and who are well versed in Six Sigma methodologies. Champions understand that Six Sigma requires sufficient financial, human, and operational resources to bring about successful outcomes. While they are typically involved in senior management, champions make sure that practitioners such as Black Belts have these resources.
Brian is a Management Consultant who is hired to improve the performance of a capital fundraising team. In his initial workshop, he relates the importance of understanding team development and its effects on their upcoming fundraising campaign. After ‘forming’, teams enter a stage where ideas compete for prominence. What is this stage called?
StormingAdjourning
Performing
Recognition
Show or Reveal the Answer
Storming
Explanation: After ‘informing’, team development enters a stage of ‘storming’ where ideas compete for prominence.
Storming is the second stage of team development following ‘forming’. In this stage, team members present their ideas for the particular task and they must establish a leadership model acceptable to all members. During this stage, they must also learn to resolve problems as they arise.
Explanation: After ‘informing’, team development enters a stage of ‘storming’ where ideas compete for prominence.
Storming is the second stage of team development following ‘forming’. In this stage, team members present their ideas for the particular task and they must establish a leadership model acceptable to all members. During this stage, they must also learn to resolve problems as they arise.
Following completion of her Six Sigma training, Stacey is responsible for Six Sigma implementation across the organization, integrating the knowledge she has gained while mentoring Black Belts. Stacey’s role is:
ChampionGreen belt
Yellow belt
Executive leadership
Show or Reveal the Answer
Champion
Explanation: A Champion is a key role in Six Sigma implementation.
Champion Six Sigma roles within an organization are vital in the implementation of quality management methodologies. Champions also serve as mentors to Black Belt certified professionals.
Explanation: A Champion is a key role in Six Sigma implementation.
Champion Six Sigma roles within an organization are vital in the implementation of quality management methodologies. Champions also serve as mentors to Black Belt certified professionals.
Melissa is a Management Consultant hired to conduct a business improvement assessment of low-performing processes in a fruit packing factory. The following are all examples of common causes in variations that could be found in this factory EXCEPT:
Equipment ageHuman reaction times
Materials variation
Shortage of skilled machinists
Show or Reveal the Answer
Shortage of skilled machinists
Explanation: Common causes of variation are small, inherent causes of variation that are related to humans, machines, and operators.
Common causes of variation are small, inherent causes of variation such as human reaction times, equipment age, and materials variation. Shortage of skilled machinists is considered a special cause of variation that can be corrected.
Explanation: Common causes of variation are small, inherent causes of variation that are related to humans, machines, and operators.
Common causes of variation are small, inherent causes of variation such as human reaction times, equipment age, and materials variation. Shortage of skilled machinists is considered a special cause of variation that can be corrected.
James is a Black Belt practitioner in a medium-sized organization. He engages in continuous assessment of projects and their potential impact on the organization’s financial well-being. The cost of defects on an organization’s finances is also referred to as:
COPQCTQ
COGQ
QTC
Show or Reveal the Answer
COPQ
Explanation : Cost of Poor Quality or COPQ is the cost of defects on an organization’s finances.
When an organization has a high percentage of defective products or services, it incurs a greater cost of re-work, warranties, returned items, and customer complaints’ management. COPQ provides a numerical figure of how much these defects cost the organization.
Explanation : Cost of Poor Quality or COPQ is the cost of defects on an organization’s finances.
When an organization has a high percentage of defective products or services, it incurs a greater cost of re-work, warranties, returned items, and customer complaints’ management. COPQ provides a numerical figure of how much these defects cost the organization.
Which of the following companies was the first to enhance Six Sigma by using it to address strategic business objectives?
MotorolaTexas Instruments
Allied Signal
General Electric
Show or Reveal the Answer
Allied Signal
The section of the project charter that describes the gap between the current state and the desired state is the:
Business caseSWOT analysis
Problem statement
Project scope
Show or Reveal the Answer
Problem statement
Six months after the work of a contractor ends, a consumer’s roof collapses. This is an example of a(an):
external failureinternal failure
prevention failure
appraisal failure
Show or Reveal the Answer
external failure
Explanation: This is an example of an external failure.
An external failure is a cost of quality figure that occurs when a customer already owns a product. In this example, the roof collapsing after the consumer had already paid for it and a period of time had elapsed refers to an external failure. Depending on the length of warranty offered by a business on products or services, an external failure can be a costly one for organizations.
Explanation: This is an example of an external failure.
An external failure is a cost of quality figure that occurs when a customer already owns a product. In this example, the roof collapsing after the consumer had already paid for it and a period of time had elapsed refers to an external failure. Depending on the length of warranty offered by a business on products or services, an external failure can be a costly one for organizations.
Team members designing a new interface for a business application choose items by prioritizing them individually. Those items given a high priority rating by the most number of team members are eventually included in the interface. This team tool is referred to as:
A.) kaizen methodB.) ordinal group technique
C.) ishikawa’s diagram
D.) nominal group technique
Show or Reveal the Answer
nominal group technique
Explanation : - This team tool is referred to as the Nominal Group Technique (NGT).
A Nominal Group Technique (NGT) is a team tool used by Black Belt practitioners to reach a consensus on how to prioritize items in a group setting. If a team wishes to choose which of 3 venues to market a new application, based on the qualities of each venue, a team member attaches an importance in the form of a number such as 5 (on a scale of 1-5). Once all the numbers are added for each venue, then the highest one is chosen as a first priority.
Explanation : - This team tool is referred to as the Nominal Group Technique (NGT).
A Nominal Group Technique (NGT) is a team tool used by Black Belt practitioners to reach a consensus on how to prioritize items in a group setting. If a team wishes to choose which of 3 venues to market a new application, based on the qualities of each venue, a team member attaches an importance in the form of a number such as 5 (on a scale of 1-5). Once all the numbers are added for each venue, then the highest one is chosen as a first priority.
In quality control, the famous business adage is: “If it can’t be ____________, it can’t be managed”
scopedmaintained
measured
evaluated
Show or Reveal the Answer
measured
Explanation : In quality control, the famous business adage is: “If it can’t be measured, it can’t be managed.
Metrics are an important aspect of quality control. Processes cannot be managed effectively if they cannot be measured with accuracy. For example, delays in a production cycle cannot be managed without understanding the steps involved and their duration as well as gaining information about the performance of the machines involved.
Explanation : In quality control, the famous business adage is: “If it can’t be measured, it can’t be managed.
Metrics are an important aspect of quality control. Processes cannot be managed effectively if they cannot be measured with accuracy. For example, delays in a production cycle cannot be managed without understanding the steps involved and their duration as well as gaining information about the performance of the machines involved.
The Project Champion defines the project boundaries, indicating what work will and will not be included in the project. These boundaries are known as the:
Problem statementBusiness case
Project charter
Project scope
Show or Reveal the Answer
Project scope
a point which is outside of the lower control limit on an r-chart:
acceptance sampling, when it is used, is used:
quality control, in contrast to quality assurance, is implemented:
quality control tools are not really used to fix quality so much as they are used to:
the r chart is a control chart used to monitor a process mean
characteristic would most likely be detected by a:
which of the following quality control sample statistics indicates a quality characteristic
if a sample point plotted on a control chart is outside the control limits
the number of runs up and down for the preceding data is:
average time between completion of units is known as quizlet
the cycle time of a process if the average time between completion of success units of output
which of the following is not a basic type of production layout format?
which of the following statements is not true about value analysis/value engineering (va/ve)?
which of the following would not be considered an input in the airline business?
according to little's law, which of the following ratios is used to find throughput rate?
the control chart used for the number of defects per unit is
a control chart used to monitor the number of defects per company is called
what type of control chart is used to monitor the number of defects per unit
which of the following is not needed to calculate sample mean control charts